Grid-forming BESS not yet confirmed for minimum system strength in Australia as AEMO launches fault current trial

Grid-forming BESS have not yet been confirmed to meet the highest tier of system strength requirements in Australia’s NEM, according to AEMO. 

Share Story:

Facebook
X
LinkedIn